Our latest project in Reading was to form the concrete access pads for the main contractor Taziker to achieve their works over 4 tracks. These works were extremely crucial to achieving the short timescales when working trackside out of hours. Our operatives spent long nights scanning the complicated drainage system that runs through the train lines which enabled us to repair damaged drains within the tracks and then lay the concrete pads. Works were successfully completed on time and to budget.